mode:lina architekci's profilePatryk Lewiński's profile

Amphitheatre in Warsaw

Architecture
In Warsaw, the curtain has gone up!

Every society needs space to sit by the campfire, to talk, to listen, to see and express oneself. Brain Embassy Amphitheatre does precisely that for Warsaw. We want it to become the place of meaningful gatherings and speeches, a new symbol for this part of Mokotów and fuel for change. Through this modern construct we siphon our philosophy - search for a new angle to things already known. Make yourself utmost comfortable in Brain Embassy Amphitheatre - surrounded by nature you’ll open yourself up to new experiences.


Amphitheatre is the open, democratic space dedicated to holding interesting meet-ups and performance arts, that would be easily accessible for each and every tenant and employees of the Służewo’s business sector. Outdoor scene rose to face the demand that haunts Warsaw’s business district - lack of open and public spaces, free of fences, allowing for casual, friendly meetings out in the open.
The final shape of this building is a match made out of the classical formula of amphitheater and green zones, so desperately needed in this part of town. The object is inscribed into a circle, covered by the massive, glass filled - concrete roof, supported by the powerful, ferroconcrete wall.

Over and around the auditorium goes the characteristic, monumental concrete ring encircling both concrete/englassed roof as well as grass-covered hill by the street. It was carefully placed as such, at this specific angle to allow for s seamless transition of the landscape into the auditorium.
PROJECT: Amfiteatr Brain Embassy
INVESTOR: Adgar Poland
LOCATION: Adgar Bit, Konstruktorska 11, Warszawa
COMPLETION: September 2020    
DESIGN: mode:lina™
DESIGN TEAM: Paweł Garus, Jerzy Woźniak, Magdalena Strąg   
ARCHITECTURAL TEAM: architekci Ewa Pawlicka-Garus, Lidia Jeżak, Beata Czarnocka, Monika Urbanek
COOPERATION: Pracownia Architektoniczna Poznań-Projekt, DEMIURG PROJECT S.A., Pracownia Projektowa Jacek Kryske
GENERAL CONTRACTOR: DM Building
PROJECT MANAGER: PM Services Poland Sp. z o.o.                        
PHOTOS: Patryk Lewiński

Amphitheatre in Warsaw
Published:

Amphitheatre in Warsaw

Published: